Green Point Stadium, Cape Town, South Africa
Cape Town gets prepared
In the summer of 2010, South Africa is the focal point of soccer fans all around the globe. Green Point Stadium with a capacity of 68,000 seats is one of the venues.
| Customer requirements: |
Our solution:
|
|
A flooring solution which
- reliably seals the entire electrical system fitted under the seats
- is extremely resilient due to the fact that it is also the main traffic artery of the stadium infrastructure
- meets high hygienic standards in kitchen and catering areas
|
- Mastertop® 1332: a UV-stable polyurethane-based multi-layered decking system
- Masterflex® 150: a flexible silicone-based joint sealant on all expansion joints
- Ucrete® UD 200: a flooring solution which allows for thorough cleaning with steam or chemical detergents
|

The client asked especially on concourse Level 2 for a 10-year guarantee that the 14,600m² floor space would be able to handle the pedestrian and vehicular traffic as well as be protected against environmental conditions.
With flooring solutions by BASF, the Green Point Stadium in Cape Town is thoroughly prepared. Mastertop® 1332 is non-slip, crack-bridging, extremely abrasion-resistant, and resilient to ultraviolet radiation. It also provides reliable waterproofing, deals excellently with the anticipated traffic, and the surface profile can be adapted variably to meet different needs. Before applying Mastertop® 1332, all expansion joints are sealed with Masterflex® 150, a flexible silicone-based joint sealant. Ucrete® UD 200 is the specific flooring solution for all kitchen and catering areas.