Search
Home >> References >> East-West Highway, Algeria

East-West Highway, Algeria 

Providing Strength for Algeria's Infrastructure

One of the world’s largest public construction projects in 2009 was supported by a wide range of BASF solutions and products: the new East-West Highway in Algeria, a six-lane highway with a total length of 1,216 kilometers which runs through eleven tunnels and across 25 viaducts from the Tunisian border in the east of Algeria to the Moroccan border in the west.


 Customer requirements:  Our solution:
  •  Meeting growing transportation needs and improving road safety
  • A package of cost-efficient, high-performance and robust construction chemicals solutions
  •  Superplasticizers Glenium® 27 and Rheobuild® 850 for bridge construction
  • Emaco® S 88C and Emaco® R 303 for concrete repairs
  • Masterflex® and Masterseal® 550 for the waterproofing of tunnels
  • MEYCO® SA 160, to help stabilize tunnels and slopes
  • Concresive 1441, an adhesive for connecting precast concrete elements
  • And several more products of BASF
  • In addition, technical expertise and support on the site
 

 

 



The superplasticizers Glenium® 27 and Rheobuild® 850 were used to modify the concrete for bridge construction, while concrete repairs were carried out using Emaco® S88 C and Emaco® R303. Masterflex® waterstop tape and Masterseal® 550 were used for waterproofing the tunnels, Concresive® 1414 for connecting precast concrete parts and Flowcable® grout for fixing anchor bolts. Rheofinish® 202 provided a smooth surface for the precast concrete parts, and superplasticizers with air-entraining agents Microair® 120 and Microair® 111 along with the evaporation protection agent Masterkure® 106 secured a high level of concrete quality. MEYCO® SA 160, an alkali-free accelerator for sprayed concrete, helped stabilize tunnels and slopes.

 

 

 

 

 

 

 

 

DisclaimerCreditsDataProtectionCopyright 2008 BASF SE
BASFCC.Moss.Core.wsp 1.0.0.8 - S:38 T:26/05/2013 07:06:57